Great project to be involved in and took all our experience to get it over the line. The barn was just outside Bury St Edmunds in Suffolk. The sqm was close on 500, and it required the erection of our tower scaffolding, it was treated to BS476 Class 1 Euro Class B and it will be used for storage pods after construction.